• C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
  • C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
  • C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
  • C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
  • C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
  • C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch

C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch

After-sales Service: on Line
Warranty: 1year
Manufacturing Process: Forging
Surface Treatment: Oxidation
Operation Pressure: No
Material: Zg35mrmo
Customization:
Gold Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory
  • Overview
  • Product Parameters
  • Certifications
  • Company Profile
  • Exhibition
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
C
Capacity
48kn.M
Transport Package
Wooden Case
Specification
2 3/8-10 3/4
Trademark
Strong
Origin
Jiangsu. China
HS Code
8431431000
Production Capacity
30 Set/Sets Per Month

Product Description

               C Manual Tong for drilling rig 2-3/8inch ~ 10-3/4inch

C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
1. Q23/8-103/4 /48 C Manual Tongs is used to fasten or remove the screws of drill tool and casing in well drilling operation.
2. The handing size of this type tong can be adjusted by changing latch lug jaws.
3. Q 2 3/8-10 3/4 /48 C Manual Tongs Rated Capacity (KN.m) is 48
Product Parameters
No. of latch No. of short latch Handle OD mm(in) Rated Capacity
mm in KN.m
1 1# 60.33-93.17 2 3/8-3 5/8 48
2 1# 73.03-108 2 7/8-4 1/4
3 1# 88.9-133.35 3 1/2-5 1/4
4 1# 133.35-177.8 5 1/2-7
5 2# 177.8-219.08 7-8 5/8
6 2# 244.5-273.05 9 5/8-10 3/4
C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
 
Certifications

 

C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
Company Profile

C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch

Exhibition

C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch

C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
 
Packaging & Shipping
C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
C Manual Tong for Drilling Rig 2-3/8inch ~ 10-3/4inch
FAQ

 

The information you may like to know before order:
 1. Methods of Payment:
  T/T (Telegraphic Transfer) sor Western Union or L/C at sight
2. Handling time for an order
  Based on order quantity, normally it takes 20 days for production.
  Only 2 or 3 days if we have stock on your request size.
3. Shipping way
  Sample order: we suggest Courier express like DHL/UPS/TNT/FEDEX or by air
  Bulk order: we suggest by air or by sea.
4. Quality Control
  We have our own experienced QC.
  There will be strict inspection and testing for every order before shipping out.
5. After Services:
  1. Our sales team will response for your question within 24 hours (Holidays Excluded)
  2. Technical Support will be available in any time
  3. Free replacement will provide once the failure confirmed caused by our product quality

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now