dB Manual Tongs for Oil Drilling Operation

Product Details
Customization: Available
After-sales Service: on Line
Warranty: 1 Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Gold Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
300000 RMB
Plant Area
1001~2000 square meters
  • dB Manual Tongs for Oil Drilling Operation
  • dB Manual Tongs for Oil Drilling Operation
  • dB Manual Tongs for Oil Drilling Operation
  • dB Manual Tongs for Oil Drilling Operation
  • dB Manual Tongs for Oil Drilling Operation
  • dB Manual Tongs for Oil Drilling Operation
Find Similar Products
  • Overview
  • Product Parameters
  • Company Profile
  • Exhibition
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
DB
Certification
ISO 9001:2008
Surface Treatment
Oxidation
Centralizer Type
Semi-Rigid
Structure
Slider
Material
Zg35mrmo
Type
Centralizer
Transport Package
Wooden Case
Specification
3 1/2′′-17′′
Trademark
Strong
Origin
Jiangsu. China
HS Code
8431431000
Production Capacity
30 Set/Sets Per Month

Packaging & Delivery

Package Size
201.00cm * 116.00cm * 41.00cm
Package Gross Weight
860.000kg

Product Description

                DB Manual Tongs For Oil Drilling Operation

dB Manual Tongs for Oil Drilling Operation
Type Q3 1/2-17/90 DB manual tong is used for making up or breaking out the screws of drill tools and casing joint or coupling. It can be adjusted by changing lug jaws latch and latch steps.
Product Parameters
No. of latch lug jaws No. of hinge pin hole Handle OD mm(in) Max. Torque(KN.m) Weight(Kg)
 1 1 89-152(3 1/2-6) 90 370
2 127-178(5-7)
3 152-210(6-8 1/4)
2 1 203-244(8-9 5/8) 90
2 270-286(10 5/8-11 1/4)
3 1 298-324(11 3/4-12 3/4) 55
2 340-365(13 3/8-14 3/8)
4 2 406-432(16-17) 55
dB Manual Tongs for Oil Drilling Operation
dB Manual Tongs for Oil Drilling Operation
dB Manual Tongs for Oil Drilling Operation
 

 

dB Manual Tongs for Oil Drilling Operation
Company Profile

dB Manual Tongs for Oil Drilling Operation

Exhibition

dB Manual Tongs for Oil Drilling Operation

dB Manual Tongs for Oil Drilling Operation
dB Manual Tongs for Oil Drilling Operation
 
Packaging & Shipping
dB Manual Tongs for Oil Drilling Operation
dB Manual Tongs for Oil Drilling Operation
dB Manual Tongs for Oil Drilling Operation
FAQ

 

The information you may like to know before order:
 1. Methods of Payment:
  T/T (Telegraphic Transfer) sor Western Union or L/C at sight
2. Handling time for an order
  Based on order quantity, normally it takes 20 days for production.
  Only 2 or 3 days if we have stock on your request size.
3. Shipping way
  Sample order: we suggest Courier express like DHL/UPS/TNT/FEDEX or by air
  Bulk order: we suggest by air or by sea.
4. Quality Control
  We have our own experienced QC.
  There will be strict inspection and testing for every order before shipping out.
5. After Services:
  1. Our sales team will response for your question within 24 hours (Holidays Excluded)
  2. Technical Support will be available in any time
  3. Free replacement will provide once the failure confirmed caused by our product quality

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now